50 PROJECTS OVER 50 YEARS
For more than five decades, H2R’s team has supported complex projects across energy, environmental and mining, government, ports, private-sector development, transportation, and water resources. This showcase is maintained directly from the new Projects area.
Selected H2R Projects
A selection of the infrastructure, engineering, and construction challenges our team has helped solve.
01
8.5 SMA Verification Cores
02
A2 STA Value Engineering Study
03
Auberge Residences Geotechnical Construction Support Services
04
Barnstable Fairgrounds Solar Canopy
05
Blue Origin Orbital Launch Facility
07
C-18W Restoration Project
08
C-23 South Reservoir Project
09
C-25 Reservoir and Stormwater Treatment Area – Intermediate Design
10
C-44 Reservoir/STA Project, Contract 2
11
Confidential Client
12
FDOT D1 Districtwide
13
FDOT District 7 Districtwide Geotechnical & Materials Testing
14
FDOT Districts 1 & 7 Materials & Testing CEI Support
15
Florida Power and Light Gas Turbines
16
Fort Lauderdale-Hollywood International Airport Runway Expansion
17
FPL Dania Beach Energy Center Modernization
18
Herbert Hoover Dike Reach 1 Cutoff Wall
19
Jade Signature Tower
20
Lake Manatee Dam Phase II Repairs
21
Lighterage Wharf and Lift-Launch Pier MCSF Blout Island Command
22
McNab Road Improvements
23
MESD Deep Cutoff Wall
24
MIC (Miami Intermodal Center) Earlington Heights Connector (Orangeline)
25
Moose Creek Dam Safety Modification
26
NASA Stennis B-2 Test Stand
27
Naval Center Contamination Assessment
28
NAVFAC SE IDIQ Waterfront Projects
29
Norris Cut Tunnel
30
Okeechobee City Hall Storm Hardening Improvements
31
Palm Beach International Airport @ I-95 Connector
32
Peace River Reservoir Expansion
33
Pembroke Road Extension
34
Pinellas County Continuing CEI Services
35
Pinellas County Public Works
36
Pinellas County Septic to Sewer Program
37
Port Everglades North Bulkhead Replacement
38
Port of Miami Tunnel
39
Port Tampa Bay Berths 3 and 219 Extensions
40
PortMiami Cruise Berths 1–6 Vibration Monitoring System
41
Rio Nigua Laboratory Audit and Data Evaluation
42
SE 5th Avenue Bridge Improvements
43
Southeast Wastewater Treatment Plant Improvements & Expansion
44
SR 300 over Apalachicola Bay – St. George Island Bridge
45
SR 699/Johns Pass Bridge Replacement
46
SR 836 / I-395 / I-95 Design-Build (Signature Bridge)
47
Suncoast Parkway
48
Tampa International Airport (TPA) Main Terminal Curbside Expansion
49
Teller Dam Rehabilitation
50
THEA Selmon Extension
